View Single Post
  #7 (permalink)  
Old July 26th, 2007, 05:44 PM
Charc Charc is offline
CB Supporter 

Technical Director
 
Join Date: Feb 2007
Posts: 1,820
Thanks: 16
Thanked 30 Times in 25 Posts
Default Re: Patch to board... unpatch from...

Quote:
Originally Posted by jmabray View Post
You have outlook controls. SWC only has 8 and 16 button stations if I remember right.... Premire has to have a seperate processor box.
The beauty of Outlook is that you can wire it into the dimmer rack direct. But you do have rooms and channels to contend with. There is an outlook patch in the SV control module. If you remove a dimmer from the room,you won't be able to control it.
I believe that the rack operates on an HTP (Highest Takes precedence) signal as opposed to an LTP. Meaning that what ever is higher - the level from the console DMX or the level from the outlook station - that is what gets played back....
Right, that's what I meant. I've read "highest takes precedence" all over the manual. What I meant was that, but said completely backwards, is that since the house-lights will be off during the show, if someone hits the architectural controls, they will turn on.
Reply With Quote