Default Help for Research Project: Grids

I am conducting a research project in which I need a good idea of the sizes and materials of grids used for the hanging of curtains and set pieces. I am asking for the dimensions of the individual grid beams and the distances between them. Any help would be greatly appreciated.
Reply With Quote
Old February 24th, 2009, 05:36 PM
Footer's Avatar
Senior Team
 Premium Member 
 
Join Date: Nov 2005
Location: Saratoga Springs, NY
Posts: 3,753
Thanks: 1
Thanked 134 Times in 129 Posts
Default Re: Help for Research Project: Grids

That could be anything from off the shelf ceiling truss to S20x96 I Beam.

Usually beams are on 9' or 8' centers to allow loft block to be attached, but depending on the battens being used that number can get larger or smaller. There is not a typical design though, there are commonly used designs but it all depends on what the house is built for. Some theatres are built to just hang dead hung curtains and electrics. Others are built for 90 linesets with a maximum load of 1000# per lineset. Therefore, the steel must be able to support 1,800,000# plus all the rigging hardware and infrustructure.

Also, there is a difference between the grid and the steel. In most newer installs, loft blocks are underhung on steel that runs DS/US. The "grid" is hung below that and allow for people to walk around and access the loft block and to hang points.

So... what kind of theatre are you looking at?
__________________
Kyle Van Sandt
Technical Director
Home Made Theater
Van Sandt Designs
Reply With Quote
Old February 24th, 2009, 06:28 PM

 
Join Date: Feb 2009
Posts: 4
Thanks: 0
Thanked 0 Times in 0 Posts
Default Re: Help for Research Project: Grids

Okay, I am talking about the steel or the place at which equitment would be secured to. As for the theatre itself I will be focusing on those that use dead hang locations rather than linesets.
Reply With Quote
Old February 24th, 2009, 08:29 PM
Van's Avatar
Van Van is offline
CBmod
 Premium Member 
 
Join Date: Jul 2006
Location: Portland, Or.
Posts: 3,828
Thanks: 44
Thanked 150 Times in 145 Posts
Blog Entries: 3
Default Re: Help for Research Project: Grids

So are you looking into more of a pipe grid situation ? If you are wondering about Hardware reccomendations for attaching to existing steel structures / I-Beams, there are several options available depending on the aplication, load, and permanance. Actual rigging info, you are not going to find here. If you don't know how to ask what you are looking for you shouldn't be trying to do any rigging in the first place. I, and most here, would reccomend that you contact a Profesional Licensed Rigger or a Stage rigging company. I hope we can help you figure out the information you are looking for.
When you say research project are we talking a hypothetical application, or are you looking into actual contsrtuction techniques.
We're a ery nosey bunch and the more info you provide about what you are doing the much more likely chances we can steer you in the proper direction.
__________________
Van J. McQueen
Technical Director
Artists Repertory Theatre


Some people are like Slinkies...
Not really good for anything,
But they still bring a smile to your face.........
When you push them down a flight of stairs.....
Reply With Quote
Old February 24th, 2009, 08:56 PM
DaveySimps's Avatar
CBmod
 Premium Member 
 
Join Date: Feb 2007
Location: Marine City, MI
Posts: 1,305
Thanks: 3
Thanked 26 Times in 26 Posts
Default Re: Help for Research Project: Grids

It very much appears as if it is for a research project for school, not for actually rigging a system. She posted in the New Member forum stating she is a college engineering student trying to incorporate a bit of theatre into her degree.

~Dave
Reply With Quote
Old February 24th, 2009, 09:01 PM

 
Join Date: Jan 2008
Location: Corpus Christi, Texas
Posts: 74
Thanks: 0
Thanked 2 Times in 1 Post
Default Re: Help for Research Project: Grids

I used to work for Texas Scenic as an installation rigger, i.e., one who installs theatrical equipment into performance spaces, so perhaps I can shed some light onto your query, which I presume is a research project for a grade.

Normally, the structural steel is not visible from the stage itself, but is covered over with drywall and painted, usually black. As stated by Footer, it can be ceiling truss or I-beam or channel steel and normally runs upstage and downstage on 7 to 9 foot centers. In most cases, depending upon the width of the stage, there will be 5 to 7 steel members from which to hang.

Usually, bull-dog chain is wrapped around the structural steel and through bolted with x-number of inches of chain hanging down that is then used to secure the hanging brackets for the curtain track or pipe from which the curtain or electric will be suspended.

Does that help?
Rich
__________________
Rich Moore
Technical Coordinator
Performing Arts Center
Texas A&M--Corpus Christi
Corpus Christi, Texas


"With a philosophical flourish, Cato throws himself upon his sword; I quietly take to the ship." -Melville-
Reply With Quote
Old February 24th, 2009, 11:34 PM
icewolf08's Avatar
CBmod
 Premium Member 
 
Join Date: Jan 2007
Location: Salt Lake City, UT
Posts: 3,099
Thanks: 21
Thanked 150 Times in 134 Posts
Send a message via AIM to icewolf08 Send a message via MSN to icewolf08 Send a message via Yahoo to icewolf08 Send a message via Skype™ to icewolf08
Default Re: Help for Research Project: Grids

If you are researching this for a project or for an install, probably the best thing to do is contact JR Clancy or Sapsis Rigging as they really are the industry leaders in this country for rigging. You also might get in touch with some of the major theatre design/engineering firms like Fisher Dachs Associates.
__________________
Alex Weisman
Master Electrician - Pioneer Theatre Company
IceWolf Photography
[email address]

Soup or art?

"Crap happens, it is our job as technicians to fix the problem and see if it can be avoided. That does not mean yelling at actors or other crew people. We make mistakes, that is life. Welcome to live theatre, if it were the same every night it would be TV." ~Me

Love CB? Upgrade to premium today!
Reply With Quote
Old February 25th, 2009, 01:12 AM

 
Join Date: Feb 2009
Posts: 4
Thanks: 0
Thanked 0 Times in 0 Posts
Default Re: Help for Research Project: Grids

Thank you for the suggestions about firms to contact about grids installed. Actually the system, I am working with at the university is a channel steel running up and down stage that serves as both the grid and the steel (as explained earlier). I have never worked with this type of system before. Everywhere I have work up till now has used hung pipes by which the lights and curtains were hung. I appologize I do not know termology with the grid. I am working with a senior technical director, but I still have a bit of a learning curve. The most important information I am trying to find is the spans between the steel and the dimensions of the steel beams themselves in various theatres. I'm trying to make my rigging system as universally adaptable as possible.
Reply With Quote
Old February 25th, 2009, 03:20 AM
gafftaper's Avatar
Senior Team
 Premium Member 
 
Join Date: Jan 2006
Location: Seattle, Washington
Posts: 6,649
Thanks: 46
Thanked 231 Times in 191 Posts
Blog Entries: 6
Default Re: Help for Research Project: Grids

Still unclear what you are doing in general.

Can you explain more of what you mean by the word "Grid" as there are several ways to use it. It sounds like what you are talking about is NOT the typical use of the word. As Van said it sounds like you are talking about hanging a pipe grid or possibly dead hanging pipes from the ceiling. The most common use of the word "grid" refers to a part of a theater building with a fly system. It is a steel grid (little rectangles about 1"x3"), mounted around 7 feet or so from the top of the fly space. Permanently built into the building, the grid supports and/or allows access to all the cables and pulleys of the fly system. You can go up and walk around on this grid to repair and maintain your fly system or it can be used for rigging. You don't hang lights from it as it's typically more than double the height of the proscenium arch and it has no pipes or attaching points... it's little steel rectangles for walking on.

Is this a class project?
Are you trying to design something that will actually be installed?
If you can post pictures or drawings of what you are trying to do that is always helpful.

I'm sure we can help you but we need a little more information.
__________________
Community College Technical Director
Reply With Quote
Reply

Tags
grids, project, research

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
"Video Wall" project for musical bwhiteford Multimedia, Projection, and Show Control 17 February 24th, 2009 10:28 PM
Mole Light Conversion Project ship Lighting 10 January 8th, 2009 10:15 PM
New projection Project, Help plz! ty Stoldal Multimedia, Projection, and Show Control 11 January 7th, 2008 07:32 AM


All times are UTC -4. The time now is 10:20 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.1 
Advertisement System V2.6 By   Branden

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80