Go Back   ControlBooth > CB Discussions > Facility
 
    Advanced Search

Notices

Facility All about your theatre, discuss design, layouts, maintenance, repair, safety concerns, remodel ideas, new building designs, and of course, photos of your facility!


Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old March 4th, 2009, 12:48 PM

 
Join Date: May 2006
Location: Greenville, MI
Posts: 177
Thanks: 6
Thanked 3 Times in 3 Posts
Default True Tales of Planning Terror

So we are past 11 years of operation in our SIngle Purchase COunterweight space. After several PMI's it is the recommended time to start changing out hand lines.

Now, this isn't a huge expense in the grand scheme of things. It's not like installing new line sets, but it is going to run into a couple of grand.

So I KNOW that my facilities manager does not have this on his radar or on ANY maintenance budget. So I go to my SuperIntendant to start the thinking process rolling on the Admin side. (A 20 year plan was submitted to Admin 4 years ago that detailed rigging lifetime change outs, as well as lighting and sound system change outs.)

Well, there is no many anywhere. And I bring up the point that this is a major safety issue and with bad hand lines we will be putting students lives at risk eventually.

The grand reply is, "Well, we might have to shut you down for a year until we can find the money."

My jaw hits the floor and I am rendered speechless. My admin is seriously considering shutting my Performing Arts Venue down because they don't have the money for facility maintenance and upgrade.

The search for emergency grants goes into high gear.

Add your true tale of Facility Planning Terror in a reply:
Reply With Quote
Old March 4th, 2009, 05:50 PM

 
Join Date: Dec 2008
Posts: 95
Thanks: 1
Thanked 2 Times in 2 Posts
Default Re: True Tales of Planning Terror

Anytime you bring up the subject of "liability" and "student safety" and "potential loss of life", those are words Admins don't want to hear. Woodshops get closed and cancelled when there's no money to install the proper safety devices. As much as we think of them as so much more, Administrators view a theatre as just another classroom. If there's no money, it's not unreasonble to think that your venue may be shut down.

I would speak to your Maint dept and see if there are options to have that kind of work done as "deferred maintenance". Speak to head of Maint/Facilities about it, they often have money set aside for these kinds of matters.
__________________
Chris Lang
Technical Director/Technician
Tiny Town School District, Smalltown, USA
Reply With Quote
Old March 4th, 2009, 07:47 PM
len len is offline
 Premium Member 

 
Join Date: Oct 2004
Location: Chicagoland
Posts: 1,397
Thanks: 8
Thanked 32 Times in 28 Posts
Default Re: True Tales of Planning Terror

Not having been in an educational, institutional or governmental situation in many many years I can't really offer much advice beyond:

"This needs doing, and it will cost roughly $XX, and I have already written this RFQ so we can start accepting bids as soon as I get your authorization to send it over the purchasing."

1. I never ask for permission, I act as if it's a foregone conclusion they will say yes.
2. I act like this is no big deal.
3. I do all the work I can before I talk to the one(s) who can say "no" don't have the excuse that they don't have time.
__________________
http://www.chicagolightingdesign.com
"I don't feel it's healthy to keep your faults bottled up inside me." - Bucky Katt
Reply With Quote
Old March 4th, 2009, 08:17 PM
beachcombah15's Avatar

 
Join Date: Dec 2008
Location: Cape Cod MA
Posts: 57
Thanks: 6
Thanked 1 Time in 1 Post
Default Re: True Tales of Planning Terror

Although I cant think of anything off of the top of my head, I will say, DONT LET THEM SHUT IT DOWN! With the way to economy is looking these days, it could end up being ALOT longer than a year before they have sufficient funds for this

These days around here, there are no programs being added, no expensive upgrades being made (except for a new $300,000 stadium football/soccer field renovation/resodding.) to any of the facilities. It's all cutbacks; Our school board just approved a $700,000 budget cut for the next fiscal year between our middle and high school. If there is any money that I want to get for rentals, upgrades etc, I either have to do a whole lot of sucking up to the department heads of departments that have money or raise it myself.
__________________
Sam Paine
NRHS Student Head of Crew/Designer
Reply With Quote
Old March 4th, 2009, 10:19 PM
derekleffew's Avatar
Senior Team
 Premium Member 
 
Join Date: Aug 2007
Location: Las Vegas, NV, USA
Posts: 3,535
Thanks: 98
Thanked 261 Times in 227 Posts
Blog Entries: 1
Default Re: True Tales of Planning Terror

Quote:
Originally Posted by Chris Chapman View Post
...And I bring up the point that this is a major safety issue and with bad hand lines we will be putting students lives at risk eventually.

The grand reply is, "Well, we might have to shut you down for a year until we can find the money."...
Not to diminish the severity of the safety of the situation, but this appears to be either a case of either playing too high a card, or the boy who cried wolf.
__________________
"It's a shame there couldn't have been more LED fixtures at this year's LDI."
.
Reply With Quote
Old March 5th, 2009, 12:06 AM
Footer's Avatar
Senior Team
 Premium Member 
 
Join Date: Nov 2005
Location: Saratoga Springs, NY
Posts: 3,753
Thanks: 1
Thanked 134 Times in 129 Posts
Default Re: True Tales of Planning Terror

Quote:
Originally Posted by beachcombah15 View Post
$700,000 budget cut for the next fiscal year between our middle and high school
If it makes you feel any better my district is projecting to cut 70 Million from next years budget.

Now to the OP...

The guy that had my job before me shut down the theatre on campus his first day. Apparently the place had the rigging from hell. I have a dog collar on my bulletin board that was supporting a load. They closed down the theatre as they should have. It then took year to cut through the bid process to get new rigging put in. So, yes, you can go nuts and get them to shut it down. If you have to do it for the space to be safe, do it. Otherwise, buy 500 ft of multiline II and switch out the ropes that are the worst off, most companies should be able to do that for you. What type of hand line is currently being used?
__________________
Kyle Van Sandt
Technical Director
Home Made Theater
Van Sandt Designs
Reply With Quote
Old March 5th, 2009, 01:21 AM
gafftaper's Avatar
Senior Team
 Premium Member 
 
Join Date: Jan 2006
Location: Seattle, Washington
Posts: 6,649
Thanks: 46
Thanked 231 Times in 191 Posts
Blog Entries: 6
Default Re: True Tales of Planning Terror

Have you had a professional inspection? Life of rope is highly variable. It could be that you only need to replace a couple of lines. It could also be that you are in terribly dangerous situation and need to be shut down right now. Start with getting an inspection.

I don't want to minimize the situation and should be pushing for replacement. But until you get a full pro inspection you don't have the full picture. There are many facilities out there that have ropes in use beyond the recommended life. Is it dangerous? Depends on what the inspector says. In my personal facility, based on the type of rope, climate, and type of use I've been told, BY A REAL RIGGING INSPECTOR, that I can go well beyond the typical replacement life. Get that inspection and give the report to the district.

Second thought... you are in a school right? Talk to the principle about the status of the end of the year use or loose budget. Often there is money that goes unused and get's sent back to the district at the end of the year. Have a bid all worked out on a per lineset basis. Get what you can from the principle and fix a few lines. Next year get a few more done.
__________________
Community College Technical Director
Reply With Quote
Old March 5th, 2009, 11:04 AM

 
Join Date: May 2006
Location: Greenville, MI
Posts: 177
Thanks: 6
Thanked 3 Times in 3 Posts
Default Re: True Tales of Planning Terror

I rotate through different rigging compaanies for my PMI's, which we do every 2 years. On the last inspection it was recommended that the hand lines need to be looked at and possibly replaced by the next inspection. All 30 linesets don't need it, just my electrics, main, and orchestra shells (which is about 15 lines).

The OP was a vent, basically. I'm in the process of getting quotes for the change out, but it is hand lines only. Lift lines, tension and loft blocks are all good. I take care of my rigging. We are looking t wear and tear and rope lifespan. All of it is synthetic too. I can't remember off the top of my head what kind.
Reply With Quote
Old March 6th, 2009, 12:55 AM
gafftaper's Avatar
Senior Team
 Premium Member 
 
Join Date: Jan 2006
Location: Seattle, Washington
Posts: 6,649
Thanks: 46
Thanked 231 Times in 191 Posts
Blog Entries: 6
Default Re: True Tales of Planning Terror

The good news is that it is synthetic. If you are not in an unusual climate AND you keep your system properly weighted, the only factor causing your lines to wear is use. So, lines that you rarely use can last a lot longer than the expected life.* If funds are so tight, every year just pick a few of the worst lines and have them fixed. There has to be a way to squeeze $500 out of the budget somewhere.

*ALWAYS have your lines regularly inspected and listen to the professional report. Don't just assume, "I haven't used this line in years" it doesn't need to be replaced.
__________________
Community College Technical Director
Reply With Quote
Old March 8th, 2009, 11:50 AM
 Premium Member 

 
Join Date: Jun 2008
Location: Phoenix, AZ
Posts: 401
Thanks: 7
Thanked 8 Times in 8 Posts
Send a message via AIM to Sayen
Default Re: True Tales of Planning Terror

This isn't a unique problem - a school in a city south of me went through this a few years back, and their district just shut the auditorium down when the teacher pushed too far for an inspection/repair. That unfortunately only encourages teachers to take shortcuts and not repair things, as too many people would rather believe "The show must go on!" instead of paying attention to safety.

I'm assuming you've approached your principal? Call other technical teachers in the district for support? Replacing only a few linesets is a good idea - you should also be able to get an inexpensive inspection if the inspector is told you only need the physical ropes checked, although that means cutting corners. Try the local PTA/PTO for money? Make sure the school knows you're headed to them for funds and making the problem public before you actually do it, but depending on where you live those folks can be loaded.
Reply With Quote
Reply

Tags
planning, tales, terror, true

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are UTC -4. The time now is 12:24 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.1 
Advertisement System V2.6 By   Branden

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80