Go Back   ControlBooth > CB Discussions > Facility
 
    Advanced Search

Notices

Facility All about your theatre, discuss design, layouts, maintenance, repair, safety concerns, remodel ideas, new building designs, and of course, photos of your facility!


Reply
 
LinkBack Thread Tools Search this Thread Display Modes
Old October 21st, 2009, 05:17 PM
gafftaper's Avatar
Senior Team
 Premium Member 
 
Join Date: Jan 2006
Location: Seattle, Washington
Posts: 6,652
Thanks: 46
Thanked 231 Times in 191 Posts
Blog Entries: 6
Default Re: New Blackbox: What would you want?

By the way you really need to bring a theater consultant on board. Architects are wonderful for big buildings but they need the guidance of someone who knows theater AND architecture. It'll cost you a chunk of change, but it's the difference between getting a great building and one that needs remodeling before you take occupancy.

If you don't have a consultant, drop museav a P.M. If he can't do the job himself, I'm sure he can help you find someone in your area to do it.
__________________
Community College Technical Director
Reply With Quote
Old October 22nd, 2009, 08:01 AM
Tex Tex is offline

 
Join Date: Aug 2009
Posts: 68
Thanks: 2
Thanked 4 Times in 4 Posts
Default Re: New Blackbox: What would you want?

musaev: The bond money is supposed to cover construction and FF&E. Our operating budget is from a completely different source. One will not affect the other, thankfully.
gafftaper: I have suggested a theatre consultant, but that's about all I can do. Those decisions are above my pay grade! Fortunately, a consultant was used when the new school was constructed last year and I'm almost certain that those plans will be modified to work on our site. The mods should only affect the shop portion where it connects to the school building. It's not as good as having a consultant on this job too, but at least there was some input on the plans.
Thanks guys!
Reply With Quote
Old October 22nd, 2009, 02:26 PM

 
Join Date: Oct 2009
Location: NYC
Posts: 21
Thanks: 0
Thanked 0 Times in 0 Posts
Default Re: New Blackbox: What would you want?

If you have to cut, cut things that can be easily added later. Get as much hard wiring in place as you can. Socaplex and dimmers can be added later, upgrading your electrical service is much harder. Paths to run cables from booth to backstage are easier if built in. Accessible structural rigging points are always nice, and don't let the AVAC guys take over your over grid space.

Get quality that can be expanded upon wherever possible. A small cheap lightboard or sound board might be fine for now, but will be hrder to justify upgrading in 5 years, then it would be to justify buying more dimmers and mics.
Reply With Quote
Reply

Tags
blackbox

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
New Blackbox! misterm Facility 18 April 2nd, 2009 12:16 PM
Flying in a Blackbox MidnightsBrokenToe Special F/X 3 March 13th, 2009 12:43 AM
Charc's College Thread Charc Education 24 April 6th, 2008 06:16 AM
Ok here it is for your comment... gafftaper Lighting 36 August 8th, 2007 10:11 AM


All times are UTC -4. The time now is 11:24 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.3.1 
Advertisement System V2.6 By   Branden

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80