Results 1 to 3 of 3
New Facility is being discussed in the ControlBooth News forum; Central Lighting & Equipment, Inc. is proud to announce the opening of our new facility. The new facility is 11,600 ...

  1. #1


    Join Date
    Jan 2010
    Location
    Des Moines, Iowa
    Occupation
    Project Manager Rigging installation, Rigging systems design and engineering
    Posts
    1,006
    Thanks
    26
    Thanked 230 Times in 154 Posts

    Default New Facility

    Central Lighting & Equipment, Inc. is proud to announce the opening of our new facility. The new facility is 11,600 sq ft of office, warehouse and staging space. The ware house area has 22' high pallet shelving and expands our loading area to 3 loading docks.

    As of May7, 2012 our new address will be:

    Central Lighting & Equipment, Inc.
    4103 E. 16th St.
    Des Moines, Iowa 50313

    phone # remain the same:
    515-277-4190 voice
    515-277-2295 FAX
    Michael Powers, Project Manager, ETCP Certified Rigger #820 - Theatre
    Central Lighting & Equipment Inc., www.cleproductions.com
    michael.powers@cleproductions.com

    TANSTAAFL

  2. #2
     Premium Member 


    Pie4Weebl's Avatar
    Join Date
    Feb 2006
    Location
    New York City
    Occupation
    LD/Programmer
    Posts
    2,085
    Thanks
    25
    Thanked 102 Times in 78 Posts

    Default Re: New Facility

    congrats! There is nothing quite as exciting as moving up into a new space!
    Victor Zeiser
    LD at Large

    "When darkness is there, power to the fixture is not prevailing"

  3. #3


    Join Date
    Feb 2004
    Location
    NJ Shore
    Occupation
    Pro
    Posts
    5,918
    Thanks
    146
    Thanked 124 Times in 116 Posts

    Default Re: New Facility

    An additional pair of docks....
    Philip LaDue
    9 year member.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •