ControlBooth
 

Go Back   ControlBooth > CB Discussions > Scenery

Notices

Scenery Can't figure out how to design or build that set just so? Post your questions or tips and tricks here!


Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old January 17th, 2008, 04:16 PM

Techie
 
Join Date: Jan 2004
Posts: 173
Thanks: 1
Thanked 0 Times in 0 Posts
Default Shortening a backdrop as it is flown out

I have a quick question to throw out there. I'm doing lighting and set design work for a production of My Fair Lady and we are constructing a two story study. The height of the study is forcing us to raise teaser heights and now we aren't going to have enough space to completely fly out a couple backdrops we will be using. We are planning to rig the backdrops so that they shorten themselves as they are flown out. We did do this once in the past, I wasn't involved in it then but it seemed to work alright. I'm just wondering if there is a particular term or expression that refers to rigging a backdrop in this way. Any suggestions on the best way to do it?
The way I'm planning is to connect 4-5 lines to the bottom of the drop on the back which run up to pulleys on the batten and then to the ends of the batten. At the ends of the batten the lines go through another pulley that send them to the stage floor where they are anchored. This is rigged when the drop is flown in so that when it is flown out the bottom of the drop is pulled up toward the batten. I believe this is roughly what was done in the past. Any tips or suggestions?
__________________
-Smatticus

\"If the only tool you have is a hammer, you tend to see every problem as a nail.\"
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old January 17th, 2008, 04:21 PM
soundlight's Avatar
CB Supporter 

Technical Director
 
Join Date: Oct 2005
Location: Lewisburg, PA
Posts: 2,552
Thanks: 11
Thanked 87 Times in 78 Posts
Send a message via AIM to soundlight
Default Re: Shortening a backdrop as it is flown out

If your linesets are spaced very close together (8 inches or less), and you have a free linset immediately upstage of the drop, you could hook the lines to that lineset, and then you just run both linesets out, so that when they're both at high trim, the upstage one is pulling the drape up enough to be hidden.
__________________
Entertainment Technology/Thea. Design major
All-around techie and designer
Bucknell University
Lewisburg, PA
Imperial 120V Pirate!
Nothing is ever "state of the art"...something new comes out the next day.
"Don't ever grow up. It's over-rated."
Reply With Quote
  #3 (permalink)  
Old January 17th, 2008, 04:29 PM

Techie
 
Join Date: Jan 2004
Posts: 173
Thanks: 1
Thanked 0 Times in 0 Posts
Default Re: Shortening a backdrop as it is flown out

I may be able to do something like that for one of the two drops; I have two drops on consecutive battens with the next batten upstage of them free. So that would work for one of the two, but the other would have to be rigged in the other fashion, unless I can figure out some way to move things around.
__________________
-Smatticus

\"If the only tool you have is a hammer, you tend to see every problem as a nail.\"
Reply With Quote
  #4 (permalink)  
Old January 17th, 2008, 04:40 PM

Technical Director
 
Join Date: Sep 2003
Location: Kaukauna WI
Posts: 720
Thanks: 1
Thanked 22 Times in 21 Posts
Default Re: Shortening a backdrop as it is flown out

I think the term you are looking for is tripping drops. Most stagecraft books will have a pretty good picture and explanation of how to do about it. I am away from my books right now but Friday I could look something up for you.
Reply With Quote
  #5 (permalink)  
Old January 17th, 2008, 04:53 PM

Techie
 
Join Date: Jan 2004
Posts: 173
Thanks: 1
Thanked 0 Times in 0 Posts
Default Re: Shortening a backdrop as it is flown out

I need to just get a good stagecraft book, but if you could confirm that term that would be great.
__________________
-Smatticus

\"If the only tool you have is a hammer, you tend to see every problem as a nail.\"
Reply With Quote
Sponsored Links
  #6 (permalink)  
Old January 17th, 2008, 06:48 PM
Footer's Avatar
Senior Team

Technical Director
 
Join Date: Nov 2005
Location: Atlanta, GA
Posts: 2,626
Thanks: 1
Thanked 84 Times in 81 Posts
Default Re: Shortening a backdrop as it is flown out

Yep, its called tripping. Usually drop are built to be tripped, some even have center pipe pocket for this. Just be sure when you do trip it that you put at least a point ever 8' or so on the bottom pipe. If you have the linesets available, its pretty easy to do.
Reply With Quote
  #7 (permalink)  
Old January 18th, 2008, 07:56 AM
CB Supporter 

Assistant TD
 
Join Date: Aug 2004
Location: Pittsburgh, PA
Posts: 458
Thanks: 14
Thanked 10 Times in 10 Posts
Default Re: Shortening a backdrop as it is flown out

If you haven't already, I think you should take measurements of the height of the backdrop, the maximum height that you can fly the pipes, the height of the two-story study, and the bottom of the lowest teaser. Then sketch those to confirm that you will be able to get eveything out of sight.

Based on your first description, the backdrop will "fold" and thus be half as long. Will that length, hanging for the maximum height of the pipies, be out sight?

Joe
Reply With Quote
Reply

Tags
backdrop, flown, shortening

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Similar Threads
Thread Thread Starter Forum Replies Last Post
Quickrelease backdrop??? dminor13 Scenery 5 November 28th, 2007 07:29 PM
so you want to get some volume out of your FOH flown speakers Hughesie Sound 2 July 13th, 2007 10:00 PM
BIG Projected backdrop? TupeloTechie Special F/X 10 February 28th, 2007 09:08 PM
Trouble finding backdrop for "Cats" timize Scenery 10 February 16th, 2007 09:59 AM
Striplights On Backdrop Smatticus Lighting 5 September 2nd, 2004 10:09 PM


All times are UTC -4. The time now is 04:36 PM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.2.0
Powered by NuWiki v1.3 RC1 Copyright ©2006-2007, NuHit, LLC
Advertisement System V2.5 By   Branden

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54