Controlling two chain hoist at once

My understanding was an inch or so was close enough. Using the limits is fine to set it but I would still measure it each time. A laser style measuring device is excellent for that but the old fashioned tape measure taped to the truss certainly works.
I would suggest going motor down the better option. Hanging a hook is way easier than taking a hoist to trim. Going hoist high makes the cabling much more difficult, going hoist down makes yearly inspection and load testing much easier and faster.
 
I think I know what you mean by "hoist high" and "hoist down", but will someone please clarify? Thanks

Chase


Sent from my iPhone using Tapatalk
 

Users who are viewing this thread

Back