So in the place I work we have a fairly large and high-traffic backstage area, all of which is a concrete slab. Right now, there is no easy and safe way to run cables across this area for intercoms, extra speakers, etc. everything must be taped to within an inch of its cabley life and even then people are tripping up in the dark.
What I'm thinking is: is it possible to (get a contractor to) cut a 1-2" trough into this concrete slab to make running cabling easier? Does anybody else have such a setup? I'm concerned about how the plates that would cover the trough would stand up to the parade of heavy equipment and herds of people that moves through the area daily.
What I'm thinking is: is it possible to (get a contractor to) cut a 1-2" trough into this concrete slab to make running cabling easier? Does anybody else have such a setup? I'm concerned about how the plates that would cover the trough would stand up to the parade of heavy equipment and herds of people that moves through the area daily.