Raked Stage

Van

CBMod
CB Mods
Premium Member
The term Raked Stage refers to a stage that is set at angle with the side closest to the audience at the lowest point and rising at an steady angle as it recedes. The highest point being the furtherest away from the front of the stage and the audience. Originally raked stages were built as a means for audience members to see performers better. Because of Engineering limitations, early European theaters had flat or level audience seating areas which made it difficult for audiences to see action happening towards the back of the playing area. The solution was to raise the area that was furthest away from the audience, making it easier to see people who were further away. This lead to the term "upstaging" by which one actor would take focus from another actor by moving further "up" the rake and making himself more visible. Now days "upstaging" typically refers to the practice of crossing down stage of another actor and blocking them from the view of the audience. Raked stages reached the height of their popularity during the Italian Renaissance, when the sloping floor added to the faux dimensional effect of the painterly forced perspective. The height of the raked stage forced perspective was attributed to Georg II, Duke of Saxe-Meiningen. He not only designed settings with the upstage buildings progressively smaller, he also was know to hire midgets and dwarfs to act as (what we would call extras today) to populate the upstage area to help increase the illusion of the forced perspective. For his work in the theatre, he is known as the first modern director. http://en.wikipedia.org/wiki/Meiningen_Ensemble
With the advent of Raised seating technologies that are prevalent in modern theatres the practice of angling the stage floor itself fell out of use. Although many scenic designers still use the process of "raking" the stage as a way to convey a certain feeling to a setting, emphasize a particular area of the set, or in some cases, to overcome design limitations of the theatre.

Of course the raked stage is also responsible for our terms today of Upstage and Down stage. When the terms were coined, upstage not only meant away from the audience, it also literally meant UP stage or UP the rake, ditto for the term DOWN stage.

It should be noted that Actors' Equity Association has many regulations about the use of raked stages.
From the PDF Actors EA Rules :
F. Raked Stage
Prior to the construction of any raked stage where the incline will be greater than ¾ inch per foot, the Producer shall promptly notify Equity of such plans and provide such information as Equity may reasonably request. It is understood that when a Producer is utilizing a set from a prior production, said notice may not be possible and the Producer agrees to notify Equity as soon as a determination is made that such set will be utilized.
Any use of a rake must be cleared via the local AEA office prior to use in any production utilizing AEA actors. This is for the safety and health of the actors involved in the production as long term use of angles staging has been linked to ankle, knee, and back injuries in many actors. In some cases a special coach may be required by AEA to teach the actors how to safely work on a raked stage. Generally a pitch no greater than 1:12 should be considered if actors are to move with any sense of naturalness.
 
Last edited by a moderator:

Users who are viewing this thread

Back