I am working on a show that has a platform 11' off the ground and is 14' x14'. One actor on top and others below.
Originally I had a fabricated welding a frame for me but has since taken a higher paying job. I am a wood worker and can build a platform but the front legs they want pipe. The design is not a cantilever.
Going through books, the span is bigger than a triscuit or stressed skin.
I am contemplating making a floor from 2x8x14. Back supports from 4x4 and front with 2" pipe legs on 4x4 plates.
Any guidance or knowledge would be greatly appreciated