The above Ad will no longer appear after you Sign Up for Free!

That's easy...(lol)

Discussion in 'Lighting and Electrics' started by Dustincoc, Sep 15, 2007.

  1. Dustincoc

    Dustincoc Active Member

    Messages:
    463
    Likes Received:
    10
    Location:
    Madrid, New York
    Anyone ever get the feeling that directors, ect. think that all tech is easy? I spent half my day hanging/focusing an upcoming show only to have the set moved and have to go back extra early in the morning to refocus 24 lights out of 30, all of which can only be reached by ladder. The worst part is a friend of the directors wh stopped by and suggested moving the chairs keep saying how easy it would be to refocus.


    The Best Part is they need to be refocused by 9:30 tomorrow morning so I can write q's with the board op then do a Q2Q at 12:30...
     
    Last edited: Sep 15, 2007
  2. gafftapegreenia

    gafftapegreenia CBMod CB Mods

    Messages:
    4,348
    Likes Received:
    486
    Occupation:
    Prop-tart
    Location:
    Chicago
    YES!!!!!


    Oh man, talk to me about my highscool choreogapher/director some time. Actually, I'd rather not.
     
  3. Grog12

    Grog12 CBMod CB Mods Premium Member

    Messages:
    2,615
    Likes Received:
    172
    Location:
    Denver, CO
    This statement right here is why I need out of acadmeic theatre.
     
  4. Logos

    Logos Well-Known Member

    Messages:
    1,079
    Likes Received:
    88
    Occupation:
    Retired
    Location:
    Launceston Tasmania
    I am in an interesting position on this one. I am a LD but I am also a Director. I know exactly how long everything takes to do. Unfortunately this doesn't mean all my tech rehearsals go well.
    When I am working as an LD or Board Op for other directors I still have the same problems you guys do and my understanding of the Directors job doesn't help because, lets face it, every director except me is a technical idiot. (Disclaimer: Except for all those directors I've worked with who aren't.)
     
  5. Van

    Van CBMod CB Mods Premium Member

    Messages:
    5,779
    Likes Received:
    1,077
    Occupation:
    Project Manager, Stagecraft Industries, Inc.
    Location:
    Portland, Or.
    Nice ! Very Politic, that. :twisted:

    Hey as to the original post, What about the poor carps that have to move the whole set, before you can refocus?
    We ran into an issue with Garden, two days before first preview I'm informed that the fire marshal might want us to remove almost half the set. Well ok more like 1/4 of the set but it would have affecte the whole SL side of the set. Someone said," Oh it'll be easy, It's just some platforming...." Yeah that and a lot of grass, trees, Vaccum form brick, Fake rock, and all the framing supports all the rest of the set behind it, but it should take too long to pul it out.......
    Let's face it, Massive changes, especially during Tech Week, are unreasonable.
     
  6. Dustincoc

    Dustincoc Active Member

    Messages:
    463
    Likes Received:
    10
    Location:
    Madrid, New York
    The show is a readers theatre so the set consists of a chair and a music stand per character.
     
  7. Van

    Van CBMod CB Mods Premium Member

    Messages:
    5,779
    Likes Received:
    1,077
    Occupation:
    Project Manager, Stagecraft Industries, Inc.
    Location:
    Portland, Or.
    :oops:Oh Yeah ? Well.................... Music stands can be tricky to move, Uh......... Highly dangerous., Um................And stools Don't get me started about stools, those things are killers. :oops:
     
  8. Dustincoc

    Dustincoc Active Member

    Messages:
    463
    Likes Received:
    10
    Location:
    Madrid, New York
    Chairs, not stools, The director wanted to change them to stools but another production is using them all...
     
  9. Footer

    Footer Senior Team Senior Team Premium Member

    Messages:
    9,402
    Likes Received:
    1,799
    Location:
    Saratoga Springs, NY
    Music stands and chairs... isn't that usually props dept?
     
  10. Charc

    Charc Well-Known Member

    Messages:
    1,850
    Likes Received:
    46
    If you tie an extension cord on the bottom, does that make it electric dept's problem? :mrgreen:
     
  11. SerraAva

    SerraAva Active Member

    Messages:
    361
    Likes Received:
    11
    Location:
    Southern New Jersey
    Nah, I think thats only if you attach lights to them, like rope lights. MMMM, rope lights. With the dancing lights, changing back and forth, moving like little ants that glow.............


    Changing lights distract me :oops:
     

Share This Page

  1. This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
    By continuing to use this site, you are consenting to our use of cookies.
    Dismiss Notice