What would be the best method of installing points in the beam in the attached picture? Will be hanging a single 10' pipe off of two points. 8 LED PARS with included cabling. Load will be less than 100 pounds including fixtures, cabling and the pipe.
I'd like to run a rated shoulder eye bolt through the beam, but I'm not sure about sideloading the eye bolt. Should I use a floor plate on the underside of the beam and lag upward? Maybe a hanger iron through bolted or lagged?
This is an install in a church and will be highly visible. I don't want the lay people in the congregation doubting the integrity just off of visual appeal.