Our road house stage floor, a 10 yr. old oak T&G, that was in otherwise terrific condition, seemingly got "leaked on" last month at some point. The stage is occupied by the contractor doing HVAC work, thus the technical staff is not allowed on the "construction site", thus we didn't notice and the GC neglected to inform anyone for a bit.
A roughly 20ft x 20ft section, with a large "bubble" about 5ft x 5ft.
I've no clue what the college is going to do and have no idea if they can do a partial tear out and replace.
The expectation that the stage will re-open for May is not going to be realized.