Thatjackofalltrades
Member
Hello Control Booth,
I am working on a production that requires four large Scrim cones to be fabricated. A few problems I am in a black box without a rigging system (a grid but no fly). They are positioned at the moment at cross joints but I am wondering what the best way to hang them will be. They won't have to move until tear out so that's not an issue. Also at the moment they are drawn to have two metal rings. One at the bottom 6' in diameter one at the top 6"; will tension be enough to hold them?
Thanks so much,
Jack
I am working on a production that requires four large Scrim cones to be fabricated. A few problems I am in a black box without a rigging system (a grid but no fly). They are positioned at the moment at cross joints but I am wondering what the best way to hang them will be. They won't have to move until tear out so that's not an issue. Also at the moment they are drawn to have two metal rings. One at the bottom 6' in diameter one at the top 6"; will tension be enough to hold them?
Thanks so much,
Jack