Solved.
Thanks.
Solved.......Thanks.
The piece itself was rigged downstage with slings, the tilting batten is center of the stage and has two wire ropes at both ends (exactly at the lift lines) that attach to the bottom of the piece (there's no room for pulleys or more ropes). Not wanted movement of the battens and bending was minimized with good programming. The movement is all about speed and timing.
We use essential cookies to make this site work, and optional cookies to enhance your experience.