During my
IBEW Installation and maintenance apprenticeship, every time I was on a decent size project, a community college and two hospitals for example, when it came time for finishing, installing the new, architectural grade, switches and receptacles, the standard for the building would be hammered into our heads and CONSISTENCY was insisted upon throughout an entire project, from 3rd
level basement to 11th floor, attic and
HVAC penthouses.
Toodleoo!
Ron Hebbard