Don't feel bad. We are one of the regions largest ETC dealers and I'm waiting for stuff I put on hold last October.
If folks don't know but, as it was explained to me, ETC is having to redesign some of their Mobos to accommodate what chips they CAN get now. The result has been massive delays all over the product lines. They also ran into issues with Cable suppliers, Raw materials for things like all those aluminum parts (racks, back-boxes, cases, switch plates...)
Things are getting a ton better though, stuff is moving again and The folks I deal with in Middleton have been open and honest and informative as possible.
If folks don't know but, as it was explained to me, ETC is having to redesign some of their Mobos to accommodate what chips they CAN get now. The result has been massive delays all over the product lines. They also ran into issues with Cable suppliers, Raw materials for things like all those aluminum parts (racks, back-boxes, cases, switch plates...)
Things are getting a ton better though, stuff is moving again and The folks I deal with in Middleton have been open and honest and informative as possible.