FOH furniture?
hi folks,
Our H.S. auditorium will be undergoing a "minor" renovation, (it really needs a "major" renovation but its just not going to happen!) We will be doing a complete seat replacement, therefore seats, rows, everything will be reconfigured for current codes. I typically set up 1 to 2 tables to hold all sound equpment when we do our musicals. (between last row and entrance doors, probalby as many of you do or have done). This upcoming renovation this summer would be my chance to get something in place permantely. I have found one piece of "furniture" made by Raxxess, its nice but not big enough for what I want) If I can find something that I like it sounds like they might get it and install it (even though there is no equipmnet money for any "tech-update!). ... take what I can get! ...I can use my current equpiment and buy more in future. I also put out the idea that after the old chairs are removed to install a large conduit in the floor to run from pit to FOH location (I would love to not run snake under chairs at somepoint in the future) Maintenance Department or Building Committee is certainly not going to do any research for me. Its up to me and my tech freinds out there, ... please send any ideas, suggestions, etc.
thanks
Ray
hi folks,
Our H.S. auditorium will be undergoing a "minor" renovation, (it really needs a "major" renovation but its just not going to happen!) We will be doing a complete seat replacement, therefore seats, rows, everything will be reconfigured for current codes. I typically set up 1 to 2 tables to hold all sound equpment when we do our musicals. (between last row and entrance doors, probalby as many of you do or have done). This upcoming renovation this summer would be my chance to get something in place permantely. I have found one piece of "furniture" made by Raxxess, its nice but not big enough for what I want) If I can find something that I like it sounds like they might get it and install it (even though there is no equipmnet money for any "tech-update!). ... take what I can get! ...I can use my current equpiment and buy more in future. I also put out the idea that after the old chairs are removed to install a large conduit in the floor to run from pit to FOH location (I would love to not run snake under chairs at somepoint in the future) Maintenance Department or Building Committee is certainly not going to do any research for me. Its up to me and my tech freinds out there, ... please send any ideas, suggestions, etc.
thanks
Ray