So I decided to take a crack at updating my resume and I hit a block, I have no clue what my "position" is for the shows I have been working on this summer and what to call them on my resume. Here are two situations which happen frequently which I could use clarification on:
1. A plot for a show is created before I have anything to do with the production. I then run the load in of the show and program/run the show with no input from the designer of the plot.
2. A plot arrives from a tour, typically of the 120K variety. I get the rig gelled, bring it into the venue, run the load in, patch the desk up and turn it over to the designer.
I'm not really sure how to title either of these.
1. A plot for a show is created before I have anything to do with the production. I then run the load in of the show and program/run the show with no input from the designer of the plot.
2. A plot arrives from a tour, typically of the 120K variety. I get the rig gelled, bring it into the venue, run the load in, patch the desk up and turn it over to the designer.
I'm not really sure how to title either of these.