A few pictures of a cleaned out dimmer room following this past Sunday's graduation. The old CD-80 and Environ 2 racks will be the first to be replaced during the conversion.
The electricians have been working since the middle of last week running conduit for data distribution and additional electrical outlets, checking wiring for our house light panels and working to strip the dimmer rack. If anyone is interested in a bunch (roughly 45) dual 2.4kW dimmer modules, let me know.
Great question. We don't have a loading dock. Everything is at-grade to street level, so they must have had a forklift. We temporarily have to store everything in our school's metals shop as our scene shop overhead door is blocked by roofing cranes and some other things in our scene shop.