perhaps the electricians should borrow a burlap bag or two from the riggers to temporarily soften the edges. That or the fire bags can be arranged so the chase edges are not in contact with the cable. In any case the electrician should spend some time inspecting the cable run and taking any appropriate action necessary. both before the run is made and after.
Sounds sort of amusing, but not code compliant--which I think you, and all of us aim to be.
Inspection is fine, but an installation that invites damage to cables (a raw conduit edge) needs to be corrected before dragging cable through it.