We have just completed the basic construction of 8 periaktois that are 4 ft on a side and 16 ft high. The bottom 8 ft is constructed of 2x4 lumber and 3/8 in plywood while the top 8 ft is 1x3 lumber with luan. We've got them on 2 ft black pipe in the center for the pivot point and of course in-line casters. On first install, the units are not plumb and square. Any help in suggesting how to rectify this situation. We tried to square based on the 4x8 3/8 ply. Not sure my crew did that correctly. Anyway, any suggestions? We've got three weeks before the show opens. Thanks!