Our pit is mostly unused because of its bulky and heavy pit cover so Im looking at getting a pit elevator installed. A pit elevator was supposed to be installed when the space was built, but was cut at the last minute. So everything is excavated below the pit floor already and the J-Boxes are installed.
1. How easy would it be for an elevator to be installed, and is it best to go ahead and contact a consultant / architect?
2. Im looking at different lifts, have you worked with Serapid or some of the other technologies? If so, do you have a preference?
3. Im wanting to add trapdoors and personnel /scenery lifts into the new pit floor for use at stage trim. From what I can tell we have the clearance underneath the pit trim height to house eveything. Have any of you seen such a setup or is it a big no no? If it is possible, I'm worried that it will be ridiculously expensive. Its not a huge pit, 50' x 10' at the peak of the arch. What kind of money could we be looking at?
4. Any other questions, thoughts, concerns?
Thanks for your help guys.
1. How easy would it be for an elevator to be installed, and is it best to go ahead and contact a consultant / architect?
2. Im looking at different lifts, have you worked with Serapid or some of the other technologies? If so, do you have a preference?
3. Im wanting to add trapdoors and personnel /scenery lifts into the new pit floor for use at stage trim. From what I can tell we have the clearance underneath the pit trim height to house eveything. Have any of you seen such a setup or is it a big no no? If it is possible, I'm worried that it will be ridiculously expensive. Its not a huge pit, 50' x 10' at the peak of the arch. What kind of money could we be looking at?
4. Any other questions, thoughts, concerns?
Thanks for your help guys.