My theater is 4 years old, since I wasn't here when it opened there is a lot of important information I don't know about the building. "Grease" is coming this spring and with it the discussion of if we can handle a real car on stage. I just found this diagram below. I'm wondering if we can assuming anything about the load rating based on the diagram without knowing any span information. I guess the only thing I can KNOW for sure is that there is 2x3 around the perimeter of the 4x8 plywood and base my load calculation on that. Can I assume that there is a 2x3 every 24" or is that too much?