Our Fall Drama was Get Smart. It turned out quite well, however there was one thing that bothered me immensly. Thursday of Tech Week, with a Friday show, we finally had somewhat of a real run-thru. The actors were still struggling with their lines. As SM, its hard to give cues when the actors can't supply me with ample evidence as to the placement of their lines relative to the sound cues. Considering that the Thursday Tech Rehearsal was basically a flop, We really did an excellent job with the Friday show. That's what bothers me the most. We work so hard all week trying to get a slight idea of what is going to happen during the show, and then when the show comes, it turns out exactly the way its supposed to. The Set Construction Crew seemmed to take extra long to build the ste, which put the Scenic Design team behind schedule to start with. I guess in the future I will just have to start having build sessions every early before the show, since two months is not enough. The killer of it all is that the same few people do everything and everyone else does nearly nothing. I hate the way we take so long to do everything, so I guess I have to take the responsibility to get everything organized and started sooner to ensure plenty of time. So, what it boils down to is hating myself for procratinating and being unorganized.